Skip to main content

Mind the gap (176)

Pay attention to how this elegant wooden curtain wall resolves the front of the slab, ensuring the appropriate fire sectorisation and minimizing the need of transoms. A simple wooden rib closes from the inside the gap between the pavement and the glass.

WPP La Matriz Campus
Location

Calle de Ríos Rosas, 26
28003 Madrid
Spain

Year of construction
2019
Weight of the entire facade
Period
Finishing material
Supporting element
Photographer

Ph 1-3 Marc Goodwin

Authorship of the graphical documentation

b720+BDG

Case visible in solution?