Pay attention to how this elegant wooden curtain wall resolves the front of the slab, ensuring the appropriate fire sectorisation and minimizing the need of transoms. A simple wooden rib closes from the inside the gap between the pavement and the glass.
WPP La Matriz Campus
Location
Calle de Ríos Rosas, 26
28003 Madrid
Spain
Year of construction
2019
Solution
Weight of the entire facade
Period
Finishing material
Supporting element
Photographer
Ph 1-3 Marc Goodwin
Authorship of the graphical documentation
b720+BDG
Case visible in solution?
